Regional partner

You bring the land.
We bring the system.

Okto.green is not a franchise. It is a building system you operate in your region — with your land, your clients, your market knowledge. Okto.green provides the technical protocol, supplier contracts and platform governance. Oktopro gives you the tools to run every part of your operation. You keep 50% equity in every project.

E −9 Energy level · every project
36 Day build protocol
50% Equity stake · per project
Fixed Price · no construction surprises

What you own

Your land.
Your clients.
Your region.

As a regional partner you are the local operator. You acquire the land, manage the sales process and handle relationships with buyers and local authorities. You are not a subcontractor — you are the project developer in your region.

  • Land acquisition — you source and secure the plot
  • Sales — you manage buyer relationships and local marketing
  • Bank financing — you arrange and hold the financing structure
  • Local authority coordination — permits, utility connections, planning
  • Site management — container, safety, on-site logistics

What Okto.green brings

The system.
The suppliers.
The protocol.

Okto.green controls build quality, supply chain and technical standards — so every project delivers the same verified energy performance, regardless of region.

  • The Okto.green Building System — a standardised structural method designed to achieve E −9 on every project
  • Supplier contracts — pre-negotiated, platform-managed procurement
  • 36-day build protocol — from foundation to wind/watertight in 3 weeks
  • Technical validation — EPB studies, E-level certification, engineering
  • Platform governance — order templates, timeline control, KPI tracking

The building system

One system. Replicable across regions.

Every house in the Okto.green network is built from the same technical core — a standardised structure that achieves E −9 on every project. You deploy it in your region. We make sure it works.

Industrialised build
The building system uses components produced and pre-cut in Belgium. On site, the structure goes up in under three weeks. No improvisation. No construction surprises.
Verified energy performance
E −9 is the reference value the system is designed to achieve — not a target. Every project gets an independent EPB study. The numbers are public.
Platform intelligence
Every project generates build data — material usage, lead times, bottlenecks. The system gets more efficient with every house built across the network.

Platform support

Every duty.
Supported by
the platform.

Being a regional partner means running a serious local operation. Land acquisition, permit tracking, supplier ordering, financing structure, site coordination — each of these has its own complexity.

Oktopro is the construction operating system built to support exactly this. Not generic project management — a purpose-built platform for regional developers operating the Okto.green building system.

oktopro.com
Land acquisition tools
Plot analysis, permit feasibility checks and site qualification — structured workflows from first contact to signed deed.
Financing support
Bank submission templates, milestone-triggered payment flows and financing structure documentation — built into the platform.
Permit & procurement tracking
Checklist-driven permit coordination and platform order templates for all materials — linked directly to the Okto.green supplier network.
Build & site intelligence
36-day execution protocol with daily task flows, KPI dashboards and CO₂ tracking — every site run from the same operational playbook.
Oktopro — the construction operating system
Process integration, supplier orchestration and build intelligence — for every regional partner in the Okto.green network.
Visit oktopro.com

How it works

Four steps from land to delivery.

01
You find the land
You identify and acquire a plot in your region. Okto.green reviews the site for system compatibility and permit feasibility via the Oktopro platform.
02
Permits & engineering
Okto.green handles the technical documentation — EPB studies, engineering freeze, structural drawings. You manage the local permit track, supported by Oktopro checklists.
03
Platform procurement
All materials are ordered via the Okto.green platform — pre-negotiated supplier contracts, buffered warehouse logistics, payment on delivery confirmation.
04
Build & handover
The 36-day industrial build protocol executes. Wind/watertight in 3 weeks. You handle sales and buyer handover in your region.

Financial model

50% equity. Every project.

Okto.green holds a 50% equity stake in every project built through the network. Bank payment releases are milestone-triggered — warehouse validation, platform confirmation, timeline alignment. No payment without delivery. This is not a franchise fee. It is a shared ownership model.

50% equity
per project

Ready to build
in your region?

Okto.green is currently active in West Flanders with two regional partners. We are selectively onboarding new partners for 2026–2027 in Belgium and neighbouring regions. The first conversation is a 30-minute call — no presentation, no pitch deck.

partners [at] okto.green Or reach us via LinkedIn · Response within 48 hours