Overhangs

Architectural shading elements.

OSB sheathing

Structural board in SIP panels.

Orientation optimization

Maximizing solar gain/shading.

Operational energy

Energy used during building life.

On-site assembly of prebuilt modules.

Ensures fresh, filtered indoor air.

On-site assembly

Fast, clean construction phase.

Triple glazing

Three-pane window system for insulation.

Timer controls

Automate systems for efficiency.

Tight envelope

Continuous airtightness for energy saving.

Thermal bridge

Interrupted insulation point; must be minimized.