Junction detailing
Smart construction of meeting points.
Joule efficiency
Efficiency of energy conversion devices.
Joist insulation
Thermal barriers within floor/roof joists.
Joint sealing
Airtight detailing of panel seams.
Joint layout
Seam alignment in panelized construction.
Triple glazing
Three-pane window system for insulation.
Timer controls
Automate systems for efficiency.
Tight envelope
Continuous airtightness for energy saving.
Thermal bridge
Interrupted insulation point; must be minimized.
Technical core
Central zone for MEP installations.